For the tunnel construction we have manufactured an inclined shaft system according to EXC-2. This is a mobile working platform with three working levels, which can be moved in an inclined shaft at an angle of 55°. The working platform is used to carry out the drilling from the inclined shaft.
- Mechanical engineer
- Steel construction technician
- Sheet metal technician
-Anlagenbediener (vor allem Abkantpresse)
!38,5 h und 4 oder 5 Tage Woche!
If you are interested send an email to: cd@fertec.at